| PROJECT TITLE | PROJ. NO. | PROJECT CLASSIFICATION | |||||||
| Fenwick Manor Well | Water | ||||||||
| DESCRIPTION: | |||||||||
| Extend a water main to the Fenwick Manor Water System or drill an equivalent capacity well into the Patapsco Aquifer to replace the existing Aquia aquifer well which is now noncompliant with the revised arsenic standards. The option which will be implemented with be based upon recommendations from the Facilities Plan and engineering analysis. | |||||||||
| PLANNING JUSTIFICATION: | |||||||||
| EPA lowered the drinking water standard for arsenic from 50ppb to 10ppb. With this lowering of the standard, the Fenwick Manor Well fell into noncompliance. Arsenic is a naturally occurring element found in this area of the Aquia Aquifer, but has not been detected in the deeper Patapsco Aquifer. Over the long term, it is more cost effective to meet the arsenic standard by drilling a new well into the Patapsco aquifer or to extend a water main from the Hollywood Town Center to the subdivision then to provide permanent treatment of the existing well to remove the arsenic from the water. | |||||||||
| LOCATION: | |||||||||
| Sanitary District 8 | |||||||||
| PROJECT TITLE | PROJ. NO. | PROJECT CLASSIFICATION | |||||||
| Fenwick Manor Well | Water | ||||||||
| COST CENTER | Sewer | Water | Total Project | ||||||
| Planning | $0 | $15,000 | $15,000 | ||||||
| Engineer / Design | $0 | $75,000 | $75,000 | ||||||
| Land Acquisition | $0 | $0 | $0 | ||||||
| Construction | $0 | $300,000 | $300,000 | ||||||
| Overhead | $0 | $40,000 | $40,000 | ||||||
| Other | $0 | $0 | $0 | ||||||
| Total | $0 | $430,000 | $430,000 | ||||||
| Service Area Expansion% | 0% | 0% | |||||||
| Capital Facilities Expansion% | 0% | 0% | |||||||
| Upgrade/Replacement% | 0% | 100% | |||||||
| Other Sources% | 0% | 0% | |||||||
| Spent | Five Year Capital Improvement Budget | Total | |||||||
| APPROPRIATION | FY07 | FY 2008 | FY 2009 | FY 2010 | FY 2011 | FY 2012 | Project | ||
| SEWER | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| WATER | $0 | $215,000 | $215,000 | $0 | $0 | $0 | $430,000 | ||
| TOTAL COSTS | $0 | $215,000 | $215,000 | $0 | $0 | $0 | $430,000 | ||
| FUNDING SOURCE | Spent | Five Year Capital Improvement Budget | Total | ||||||
| FUNDS: | FY07 | FY 2008 | FY 2009 | FY 2010 | FY 2011 | FY 2012 | Project | ||
| LOANS | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| BONDS | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| GRANTS | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| NAVY | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| RESERVES | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| COUNTY FUNDS | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| STATE FUNDS | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| FEDERAL FUNDS | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| OTHER SOURCES | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| specify: | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| TOTAL FUNDS | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||