PROJECT TITLE       PROJ. NO.   PROJECT CLASSIFICATION  
Town Creek Water System Upgrade   Water
 
DESCRIPTION:                  
The Town Creek Water System was originally built in the 1950s and was formally a stand-alone water system. MetCom later took over operation of this system and incorporated it into what is now the Lexington Park Water System. The water mains in Town Creek not only do not meet current MetCom specifications, but are now almost 60 years old and reaching the end of their useful life. Additionally, due to the layout of many of the water services serving the existing homes, individual water meters cannot be installed and water usage cannot be accurately tracked. As such, the existing water mains will need to be abandoned and new water mains will be engineered and constructed. 
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
PLANNING JUSTIFICATION:  
The existing water infrastructure in Town Creek has not only reached its useful life, but is also undersized in many areas. Additionally, water meters cannot be installed to several homes in this area due to the configuration of the water services. Due to the undersized mains, fire flow is currently not provided in many areas currently served by public water. The reconfiguration of the water mains in Town Creek will provide adequate fire protection. 
LOCATION:  
8th Sanitary District                  
PROJECT TITLE       PROJ. NO.   PROJECT CLASSIFICATION  
Town Creek Water System Upgrade   Water
COST CENTER Sewer Water Total Project            
Planning $0 $15,000 $15,000            
Design $0 $75,000 $75,000            
Land Acquisition $0 $0 $0            
Construction $0 $625,000 $625,000            
Overhead $0 $72,000 $72,000            
Other $0 $0 $0            
Total $0 $787,000 $787,000            
                   
Service Area Expansion% 0% 0%              
Capital Facilities Expansion% 0% 0%              
Upgrade/Replacement% 0% 100%              
Other Sources% 0% 0%              
          Five Year Capital Program   Total    
APPROPRIATION  FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project    
SEWER $0 $0 $0 $0 $0 $0 $0    
WATER $0 $75,000 $0 $712,000 $0 $0 $787,000    
TOTAL COSTS   $0 $75,000 $0 $712,000 $0 $0 $787,000    
FUNDING SOURCE         Five Year Capital Program   Total    
FUNDS: FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Project    
LOANS $0 $0 $0 $0 $0 $0 $0    
BONDS $0 $0 $0 $0 $0 $0 $0    
GRANTS $0 $0 $0 $0 $0 $0 $0    
NAVY $0 $0 $0 $0 $0 $0 $0    
RESERVES $0 $0 $0 $0 $0 $0 $0    
COUNTY FUNDS $0 $0 $0 $0 $0 $0 $0    
STATE FUNDS $0 $0 $0 $0 $0 $0 $0    
FEDERAL FUNDS $0 $0 $0 $0 $0 $0 $0    
OTHER SOURCES $0 $0 $0 $0 $0 $0 $0    
specify: $0 $0 $0 $0 $0 $0 $0    
TOTAL FUNDS   $0 $0 $0 $0 $0 $0 $0