MD235 Water Main Southampton to Hermanville Road

Background

The MD235 Water Main Southampton to Hermanville Road project will provide a connection along MD Route 235 to the Southgate Center, a stand-alone water system, with the greater Lexington Park water system. This connection will increase reliability of the southern portion of the Lexington Park water system and alleviate the need for a second well at Southgate.  This will also allow a second connection serving the Southampton area. Approximately 800 feet of new 10” C-900 Water Main has already been installed by a cost sharing agreement with the new Dollar General at the corner of Wheeler Road and Three Notch Road.

Project Scope of Work

This project will install approximately 2,000 LF of 10-inch water main along MD235, from the corner of Southampton Drive and Three Notch Road to the corner of Wheeler Road and Three Notch Road.  The project will also include 6 Fire Hydrants, Tee’s for future system expansion, and give local homeowners the option to connect. This new main will be constructed on the shoulder of the MD235 right of way. As noted, this project is anticipated to be completed along with the Southampton Infrastructure Improvement Project Phase 1. (Southampton Infrastructure Improvement Project Phase 1)

Customer Impact

Traffic:

​

Residents in the area should expect occasional traffic impacts. Please speak with our on-site construction inspector or call the project manager below with any traffic concerns.

​

Water Service:

​

Residents in the area should expect minimal interruptions to water service during construction. The contractor is instructed to alert all residents and must obtain METCOM approval before disrupting water service to customers.

​

Sewer Service:

​

Residents in the area who are served by public sewer should expect no interruptions to sewer service during construction.

Schedule

Design:

 

Design contract was awarded to CSBI, Inc. on July 9, 2020.

​

Construction:

 

Construction is expected to begin in late fall 2024.

​

Next Phase:

 

Phase 2 design is currently underway. For more information see Southampton Infrastructure Improvement Phase 2) under design projects.

Public Notices

Public Meeting:

 

Public Meeting: Public Meetings were held at the Carver Recreation Center on September 29, 2022 and February 27, 2024. A virtual Public Meeting was held on February 6, 2024. For information regarding these meetings please contact the project manager.

Project Location

Southampton Water & Sewer Project Locati

Project Contacts

Joshua Woodburn – METCOM Project Manager: (301) 737 – 7400 x 307

(Please email any questions or concerns to jwoodburn@metcom.org)

​

Ronald Delahay – METCOM On-site Representative: (240) 298 – 0074 

​

Chris Soussanin – METCOM Chief of Construction: (301) 737 – 7400 x 311